CAD Forum - tips, tricks, discussion and utilities for AutoCAD, Inventor, Revit and other Autodesk products [www.cadforum.cz] ARKANCE | CONTACT - CZ | SK | EN | DE
Over 1.092.000 registered users (EN+CZ). AutoCAD tips, Inventor tips, Revit tips. Try the new precise Engineering calculator. New AutoCAD 2026 commands and variables.
RSS channel - CAD tips RSS tips
RSS discussions

Discussion Discussion forum

?
CAD discussions, advices, exchange of experience

CAD Forum - Homepage CAD discussion forum - ask any CAD-related questions here, share your CAD knowledge on AutoCAD, Inventor, Revit and other Autodesk software with your peers from all over the world. To start a new topic, choose an appropriate forum.

Please abide by the rules of this forum.
This is a peer-to-peer forum. The forum doesn't replace the official direct technical support provided by ARKANCE for its customers.
How to post questions: register or login, go to the specific forum and click the NEW TOPIC button.
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Topic ClosedTypical Steel Detailing Process

 Post Reply Post Reply
Author
steeldetailing View Drop Down
Newbie
Newbie


Joined: 15.May.2009
Location: United States
Status: Offline
Points: 14
Direct Link To This Post Topic: Typical Steel Detailing Process
    Posted: 16.May.2009 at 06:41

Typical steel detailing process includes:

  • The steel detailing company receives the project details from the customer along with the requirements. The files are transferred via email or uploaded them on secure ftp server or courier.
  • It reviews the project in detail in the context of the parameters such as type of service to be provided, type of structure, standards or requirements to be followed, format of final drawing and models etc.
  • The vendot then sends a quotation and time line to the client.
  • On approval of the quotation, we begin the work and the delivery model is finalized as per the client specifications
  • The Project Manager assigns work to the team and informs them about the project details, client requirements and standards to be followed
  • On completion of work, the team passes the work to the quality department
  • The quality team does the first level check and takes in to the consideration parameters such as required specification are met, standards have been followed, etc.
  • If the quality team is not satisfied then they resend the work to the department. If less corrections then same engineer or detailer corrects it and if more corrections then different engineer of detailer is assigned to correct the work.
  • If the quality team is satisfied with the work then they pass the work to the auditor who does the second level of checking.
  • Auditor passes the work meeting the quality standards to the Project Manager and if the work does not meet the quality standards then they resend it to the quality team.
  • The Project Manager sends the completed work to the client when he is satisfied with it.
For more information email us at info@outsourcingsteeldetailing.com


Edited by steeldetailing - 16.May.2009 at 06:41
Back to Top

Related CAD tips:


 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0,191 seconds.