Display full version of the post: 2019 scheduling rooms from linked model using lev

ledgewood33
11.12.2019, 18:25
we have linked models in our main model and we are scheduling the rooms
from the linked models. in the schedule it references the level from
said linked model i.e. level 1. we want it to schedule these rooms on
the level they are on in the main model i.e. level 2,3,4,5.