Posted By: ishaq03
Subject: After change the Alignment start chainage
Date Posted: 12.May.2022 at 08:52
Hi Every one, I Have a alignment which length is 112 meter but as per my requirement I have been started the   chainage from 0+1.840 then incurrent will be every 10 meter so my next chainage will be 0+11.840 but when I have change the edit Alignment label for 10 meter my next chainage coming on 0+10.00 then increasing for every 10 meter 

but my goal is first chainage 0+1.840 then 0+11.840 0+21.840 etc. I will be very glad if any body give the solution as soon as possible.

For your more understanding I am attaching the dwg here. uploads/756072/SAMPLE_.pdf" rel="nofollow - uploads/756072/SAMPLE_.pdf



-------------
ishaq



Replies:
Posted By: farjikaam35
Date Posted: 29.Dec.2022 at 08:17
Interesting, perhaps the term chainage isn't really used in the US. I'm in Canada and work with a lot of older engineers (who were previously surveyors), so that's probably why we've always referred to it as chainage.

Anyways, you've answered my question - thanks very much for that!


Posted By: farjikaam35
Date Posted: 04.Mar.2023 at 10:14
I have been started the   chainage from 0+1.840 then incurrent will be every 10 meter so my next chainage will be 0+11.840 but when I have change the edit Alignment label for 10 meter my next chainage coming on 0+10.00 then increasing for every 10 meter 

but my goal is first chainage 0+1.840 then 0+11.840 0+21.840 etc. https://routerlogin.ltd/" rel="nofollow - routerlogin


https://pikashow.ltd/" rel="nofollow - watch IPL