CAD Forum - tips, tricks, discussion and utilities for AutoCAD, Inventor, Revit and other Autodesk products [www.cadforum.cz] ARKANCE | CONTACT - CZ | SK | EN | DE
Over 1.091.000 registered users (EN+CZ). AutoCAD tips, Inventor tips, Revit tips. Try the new precise Engineering calculator. New AutoCAD 2026 commands and variables.
RSS channel - CAD tips RSS tips
RSS discussions

Discussion Discussion forum

?
CAD discussions, advices, exchange of experience

CAD Forum - Homepage CAD discussion forum - ask any CAD-related questions here, share your CAD knowledge on AutoCAD, Inventor, Revit and other Autodesk software with your peers from all over the world. To start a new topic, choose an appropriate forum.

Please abide by the rules of this forum.
This is a peer-to-peer forum. The forum doesn't replace the official direct technical support provided by ARKANCE for its customers.
How to post questions: register or login, go to the specific forum and click the NEW TOPIC button.
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Topic ClosedRevit Compatibility Issues

 Post Reply Post Reply Page  123>
Author
damienrange View Drop Down
Newbie
Newbie


Joined: 07.Dec.2007
Status: Offline
Points: 5
Direct Link To This Post Topic: Revit Compatibility Issues
    Posted: 10.Jan.2008 at 08:35
One of the major applications we use the most is AutoCAD. We want to enable all our data in our main office, and all the employees in the branch offices work in real time over the WAN links. We want to upgrade, as all our projects are the product of work progressed by employees physically located in all five of our offices.

Any experiences with real live production happening over the WAN using C3D or Revit?

Thanks in advance.
Back to Top
Vladimir Michl View Drop Down
Moderator Group
Moderator Group

Arkance Systems CZ

Joined: 26.Jul.2007
Location: Czech Republic
Using: Autodesk software
Status: Offline
Points: 2098
Direct Link To This Post Posted: 10.Jan.2008 at 19:13
Revit may depend more on the reliability and capacity of your WAN links. Civil 3D shares data on the file level, Revit on the workset (object) level.
 
But with adequately "thick" WAN lines you can use both AutoCAD Civil 3D and Revit in the same way as on LAN (which is used very often).
Vladimir Michl (moderator)
ARKANCE - https://arkance.world - Autodesk Platinum Partner
Back to Top
grachel21 View Drop Down
Newbie
Newbie


Joined: 07.Dec.2007
Status: Offline
Points: 5
Direct Link To This Post Posted: 11.Jan.2008 at 10:40
I also work in an AutoCAD (currently using 2005) environment. I was wondering how people are dealing with the Revit issues? My users complain of how slow Revit is over the link.
Back to Top
charlesbentt View Drop Down
Newbie
Newbie


Joined: 11.Jan.2008
Status: Offline
Points: 7
Direct Link To This Post Posted: 11.Jan.2008 at 12:29
Working on similar Applications.
Back to Top
sherlikt View Drop Down
Newbie
Newbie


Joined: 11.Jan.2008
Status: Offline
Points: 4
Direct Link To This Post Posted: 14.Jan.2008 at 10:39
You must look for some WAN optimization kit to solve the issues.
Back to Top
damienrange View Drop Down
Newbie
Newbie


Joined: 07.Dec.2007
Status: Offline
Points: 5
Direct Link To This Post Posted: 16.Jan.2008 at 07:50
Do you want to say that I must have adequate "thick" WAN lines? or what...?


Back to Top
grachel21 View Drop Down
Newbie
Newbie


Joined: 07.Dec.2007
Status: Offline
Points: 5
Direct Link To This Post Posted: 18.Jan.2008 at 08:40
Are you using T1 line(point to point T1, no firewall in between) or what?

If so,then I must tell you that T1 line is very slower than your LAN even that has impact on your application performance. If you really need to run files 'live' over the T1, you definitely need to go for some WAN-optimization kit.
Back to Top
sherlikt View Drop Down
Newbie
Newbie


Joined: 11.Jan.2008
Status: Offline
Points: 4
Direct Link To This Post Posted: 22.Jan.2008 at 07:13
If you really need to speed things up, you might want to go for T3 (44Mbps). Not sure of the cost difference, but time is money.
Back to Top
damienrange View Drop Down
Newbie
Newbie


Joined: 07.Dec.2007
Status: Offline
Points: 5
Direct Link To This Post Posted: 24.Jan.2008 at 07:37
The DS3 is the data carried on a T3 circuit. As far as cost to access is concerned, the price calculation has two distance steps: geomapping and the determination of local price arrangements. We need to figure out the time we will be using these carrier lines in order to manage costs.
Back to Top
charlesbentt View Drop Down
Newbie
Newbie


Joined: 11.Jan.2008
Status: Offline
Points: 7
Direct Link To This Post Posted: 25.Jan.2008 at 08:41
Please be aware that increasing the 'pipe' size will not necessarily give the performance boost you are looking for. It will heavily depend on the physical distance between the two sites. Distance is the main contributer to latency (or network delay).

The greater the delay, the more likely that a WAN link will be limited in real throughput not by the pipe size - at which point bigger pipes will make NO difference to a single users experience. This is not to say that bigger pipes are not useful, particularly when you need more users using that link at the same time.

And this leads to WAN optimizers, there primary purpose being to significantly reduce the effect of latency and also reduce the data traveling over the link.
Back to Top

Related CAD tips:


 Post Reply Post Reply Page  123>
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0,151 seconds.