Over 1.099.000 registered users (EN+CZ).
AutoCAD tips, Inventor tips, Revit tips, Civil tips, Fusion tips.
Try the new precise Engineering calculator.
New AutoCAD 2026 commands and variables.
Download of CAD utilities
Download
File Download: [ + show all files ]

File
Size
Date
Info
2013
Autodesk Fabrication CADmep 2013 Object Enabler (maps_solids) for AutoCAD 2013, LT 2013, AutoCAD Civil 2013, AutoCAD Mechanical 2013, Navisworks... (CADmep/CADduct runtime, 32/64-bit)

249MB
23.5.2012
2014
Autodesk Fabrication CADmep 2014 Object Enabler (maps_solids) for AutoCAD 2014, LT 2014, AutoCAD Civil 2014, AutoCAD Mechanical 2014, Navisworks... (CADmep/CADduct runtime, 32/64-bit)

257MB
25.4.2013
2015
Autodesk Fabrication CADmep 2015 Object Enabler (maps_solids) for AutoCAD 2015, Navisworks... (CADmep/CADduct runtime, 32/64-bit)

380MB
17.4.2015
2016
Autodesk Fabrication CADmep 2016 Object Enabler (maps_solids) for AutoCAD 2016, Navisworks... (CADmep/CADduct runtime, 64-bit)

386MB
21.6.2016
2017
Autodesk Fabrication CADmep 2017.2 Object Enabler (maps_solids) for AutoCAD 2017, Navisworks... (CADmep/CADduct runtime, 64-bit)

1GB
28.3.2017
2018
Autodesk Fabrication CADmep 2018 Object Enabler (maps_solids) for AutoCAD 2018, Navisworks... (CADmep/CADduct runtime, 64-bit)

411MB
28.9.2017
2019
Autodesk Fabrication CADmep 2019 Object Enabler (maps_solids) for AutoCAD 2019, Navisworks... (CADmep/CADduct runtime, 64-bit)

312MB
2.9.2018
2020
Autodesk Fabrication CADmep 2020 Object Enabler (maps_solids) for AutoCAD 2020, Navisworks... (CADmep/CADduct runtime, 64-bit)

344MB
4.5.2019
2021
Autodesk Fabrication CADmep 2021 Object Enabler (maps_solids) for AutoCAD 2021, Navisworks... (CADmep/CADduct runtime, 64-bit)

558MB
18.4.2020
2022
Autodesk Fabrication CADmep 2022 Object Enabler (maps_solids) for AutoCAD 2022, Navisworks... (CADmep/CADduct runtime, 64-bit)

489MB
20.4.2021
2023
Autodesk Fabrication CADmep 2023.0.2 Object Enabler (maps_solids) for AutoCAD 2023, Navisworks... (CADmep/CADduct runtime, 64-bit)

521MB
21.9.2022
2024
Autodesk Fabrication CADmep 2024.0.4 Object Enabler (maps_solids) for AutoCAD 2024, LT, Navisworks... (CADmep/CADduct runtime, 64-bit)

561MB
23.5.2025
2025
Autodesk Fabrication CADmep 2025.0.2 Object Enabler (maps_solids) for AutoCAD 2025, LT, Navisworks... (CADmep/CADduct runtime, 64-bit)

798MB
23.5.2025
2026
Autodesk Fabrication CADmep 2026.1 Object Enabler (maps_solids) for AutoCAD 2026, LT, Navisworks... (CADmep/CADduct runtime, 64-bit)

131MB
12.8.2025
--
Administrátorská příručka pro uživatele účtů Autodesk Accounts ("subscription bible", interaktivní PDF, česky - pro stažení, ne přímé otevření)
13.5MB
12.8.2016
R2015
R2024
--
Map2009
Map2010
Map2011
Map2012
Map3
--
Inventor2008
Autodesk Inventor 2008 Service Pack 3 Client Upgrade for ADMS2009 (ENG), install after AI2008sp3

4.2MB
17.6.2008
Inventor2010
Autodesk Inventor 2010 Service Pack 3 Client Upgrade for ADMS2011 (ENG) - 32-bit, install after Vault2011sp1 and AI2010sp3 (w/o bonus pack)

1.3MB
14.5.2010
Autodesk Inventor 2010 Service Pack 3 Client Upgrade for ADMS2011 (ENG) - 64-bit, install after Vault2011sp1 and AI2010sp3 (w/o bonus pack)

1.6MB
14.5.2010
Inventor 2010 + SAP Service Pack 4 Client Update for Autodesk Vault 2012 Server (ADMS2012) 32-bit

34.8MB
25.7.2011
Inventor 2010 + SAP Service Pack 4 Client Update for Autodesk Vault 2012 Server (ADMS2012) 64-bit

35.5MB
25.7.2011
Inventor 2010 Service Pack 4 Client Update for Autodesk Vault 2012 Server (ADMS2012) 32-bit

34.8MB
25.7.2011
Inventor2011
Inventor 2011 + SAP Service Pack 2 Client Update 30.6. for Autodesk Vault 2012 Server (ADMS2012) 32-bit

34MB
30.6.2011
Inventor 2011 + SAP Service Pack 2 Client Update 30.6. for Autodesk Vault 2012 Server (ADMS2012) 64-bit

33MB
30.6.2011
Inventor 2011 Service Pack 2 Client Update 30.6. for Autodesk Vault 2012 Server (ADMS2012) 32-bit

33MB
30.6.2011
Inventor 2011 Service Pack 2 Client Update 30.6. for Autodesk Vault 2012 Server (ADMS2012) 64-bit

33MB
30.6.2011
--
Autodesk Vault 2010 Update 1 (SP1), also for Vault Workgroup, Collaboration, Manufacturing - see Readme

29.6MB
18.11.2009
Autodesk Vault 2010 Update 2 (SP2), also for Vault Workgroup, Collaboration, Manufacturing - see Readme

25.8MB
1.9.2010
Autodesk Vault 2011 Update 1 (SP1), Vault Workgroup, Vault Collaboration, Vault Professional, ADMS2011 - see Readme

10.6MB
4.5.2010
Autodesk Vault 2011 Update 2 (SP2), Vault Workgroup, Vault Collaboration, Vault Professional, ADMS2011 (reqs SP1) - see Readme!

33.2MB
9.9.2010
Autodesk Vault 2012 Update 1 (SP1), Vault Workgroup, Vault Collaboration, Vault Professional, ADMS2012 - see Readme

193MB
26.10.2011
Autodesk Vault 2012 Update 2 (SP2, reqs.SP1), Vault Workgroup, Vault Collaboration, Vault Professional, ADMS2012 - see Readme

257.8MB
13.12.2012
Autodesk Vault 2013 Service Pack 1 (SP1), Vault Workgroup, Vault Collaboration, Vault Professional, ADMS2013 - see Readme

352MB
13.12.2012
Autodesk Vault 2014 Service Pack 1 (SP1a), Vault Workgroup, Vault Professional, ADMS2014 - see Readme

713MB
26.8.2013
Autodesk Vault 2014 Service Pack 2 (SP2), Vault Basic, Workgroup, Vault Professional, ADMS2014 (not for SR1) - see Readme

711MB
26.2.2014
Autodesk Vault 2014 Service Pack 3 (SP3), Vault Basic, Workgroup, Vault Professional, ADMS2014 (not for SR1) - see Readme

657MB
23.5.2015
Autodesk Vault 2014 SR1 Service Pack 2 (SP2), Vault Workgroup, Vault Professional, ADMS2014 - see Readme

362MB
26.2.2014
Autodesk Vault 2015 Service Pack 1 (SP1), Vault Workgroup, Vault Professional, ADMS2015 - see Readme

607MB
6.11.2014
Autodesk Vault 2015 Service Pack 2 (SP2), Vault Workgroup, Vault Professional, ADMS2015 - see Readme

586MB
15.10.2015
Autodesk Vault 2016 Service Pack 1 (SP1), Vault Basic, Workgroup, Professional, ADMS2016 - see Readme

95MB
18.12.2015
MBlockReplace (MBR) - replaces multiple block names with a given block (requires Express Tools, no attributes handled); VLX for AutoCAD
11.8kB
30.6.2009
V1.0
How to load a LISP application (.LSP/.VLX) into AutoCAD? See the Tip 7245.
Many other files also on ARKANCE Helpdesk, CAD blocks in the Block catalog.
PARTNERSHIP
ARKANCE UK Community - portal
IT CAD - magazine
BIMfo - BIM portal
F360 - Fusion portal
twiGIS - GIS/FM software
CAD NEWS


